You don't have javascript enabled. Good luck with that.
Pencarian
Sudin SDA Jakpus Lakukan Pengerukan di 6 Titik

Dredging in Central Jakarta Continues to Be Accelerated

To minimize inundation in the rainy season, three connecting channels (PHB) in Central Jakarta are being dredged by officers of Central Jakarta Water Resources Sub-dept. 

And now we're still focusing on Mangga Dua Dalam PHB, Mangga Dua Raya PHB and Rawa Kerbau PHB

Central Jakarta Water Resources Sub-dept.'s Maintenance Section Head, Boris Korlap Lumbangaol said, there are actually six points that will be dredged this year. Three of them have been completed, namely Lembang Lake by dredging 8,030 cubic meters of mud, Benyamin Sueb PHB with 1,200 square meters of mud and Kalibaru Timur PHB with 750 cubic meters.

"And now we're still focusing on Mangga Dua Dalam PHB, Mangga Dua Raya PHB and Rawa Kerbau PHB," he expressed, Monday (10/30).

Five Connecting Channels in East Jakarta Dredged

From the latest data, the officer has dredged 450 cubic meters of mud from Mangga Dua Dalam, 600 cubic meters of mud from Mangga Dua Raya, and 1,500 cubic meters of mud from Rawa Kerbau.

"It's targeted to be completed in the forthcoming December," he closed.

Linked News
Popular News indeks
  1. Volcanic Ash Reaches Jakarta, Health Agency Calls for Protective Measures

    access_time06-09-2026 remove_red_eye784 personBudhi Firmansyah Surapati
  2. Transjakarta Commits to Accelerating Modal Integration and Fleet Electrification

    access_time31-08-2026 remove_red_eye681 personAldi Geri Lumban Tobing
  3. JITEX 2026: Fostering a Global Trade and Investment Ecosystem

    access_time01-09-2026 remove_red_eye586 personAldi Geri Lumban Tobing
  4. Jakartans Urged to Stay Calm and Take Precautions Amid Mt. Anak Krakatau Volcanic Ash

    access_time06-09-2026 remove_red_eye531 personBudhi Firmansyah Surapati
  5. Jakarta BPBD Urges Residents to Prepare for Meteorological Drought

    access_time04-09-2026 remove_red_eye484 personAldi Geri Lumban Tobing